Assignment # 3 SPM
Difference b/w SDLC and P.M (Project Management)
Length: 4 pages IEEE format
Email the soft copy to ateebkhawaja786@gmail.com
Note: Plagiarism 'ill be checked
Source: Mir Jamal ud Din
Quiz # 1 Numerical Analysis
All commands which sir taught in class 'll be queried and u 'll be asked to Perform
Source: Sir Muhammad Iqbal
Quiz #1 Entrepreneurship
From all lectures.
Source : Ma'am Adeeba
Quiz # 1 Compiler Construction
Source: Sir Khurram Shahzad
Lab task #3
Source: Ma'am Ayesha
(1)ArrAYS.
(2)CLASSES
(3)INHERITANCE.
(4)CONSTRUCTOR/DESTRUCTOR
(5)HYBRID.
THE TASK SHOULD BE PERFORMED IN THE FOLLOWING WAY:
FOR INSTANCE:
>>ARRAY: .
>>TASK
>>CODE: SCREENSHOT (IT SHOULD BE CROPPED DEPICTING THE CODE)
>>OUTPUT: SCREENSHOT OF THE OUTPUT
Thanks and Regards
Difference b/w SDLC and P.M (Project Management)
Length: 4 pages IEEE format
Email the soft copy to ateebkhawaja786@gmail.com
Note: Plagiarism 'ill be checked
Source: Mir Jamal ud Din
Quiz # 1 Numerical Analysis
All commands which sir taught in class 'll be queried and u 'll be asked to Perform
Source: Sir Muhammad Iqbal
Quiz #1 Entrepreneurship
From all lectures.
Source : Ma'am Adeeba
Quiz # 1 Compiler Construction
Source: Sir Khurram Shahzad
Lab task #3
Source: Ma'am Ayesha
(1)ArrAYS.
(2)CLASSES
(3)INHERITANCE.
(4)CONSTRUCTOR/DESTRUCTOR
(5)HYBRID.
THE TASK SHOULD BE PERFORMED IN THE FOLLOWING WAY:
FOR INSTANCE:
>>ARRAY: .
>>TASK
>>CODE: SCREENSHOT (IT SHOULD BE CROPPED DEPICTING THE CODE)
>>OUTPUT: SCREENSHOT OF THE OUTPUT
Thanks and Regards